Fiper Projcet Experience

No.
Project Names
Project Owner
Customer
Sector
Project
Years
PROJECT STATUS
Locations
1RETROFIT FACTORY EQUIPMENTPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESF1-JAKARTA FACTORY2016COMPLETED
        
2REPAIR & MAINTENANCE 4 X 300 KVA DIESEL ENGINEPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESEBI1-JAKARTA FACTORY2016COMPLETED
        
3SUPPLY & INSTALL ALMIG DESSICANT DRYERBP BINTUNIPT. WIJAYA KARYA (Persero)OIL & GASLAMONGAN SHORE BASE2016COMPLETED
        
4ME – TRK 3 “2 X JGS 620” (2 X 3,3 MW) JENBACHER GAS ENGINE POWER HOUSE TYPEMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. PHILIPS2016COMPLETED
        
5SUPPLY & INSTALL HIGH PRESSURE GAS METERING REGULATING STATIONMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. PHILIPS2016COMPLETED
        
6GAS PIPELINE Ø14″ SCH 40MAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. PHILIPS2016COMPLETED
        
7REAPAIR & MAINTENANCE FACTORY EQUIPMENTPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2016COMPLETED
        
8RETROFIT 5 X GE JENBACHER JGS 620 NL GAS ENIGE ENCLOSUREMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPEKANBARU WAREHOUSE2016COMPLETED
        
9EPC – TRK 4A “2 x JGS 620” (2 X 3,3 MW) GE JENBACHER JGS 620 NLMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. BELAH2017COMPLETED
        
10SUPPLY & INSTALL MEDIUM PRESSURE GAS METERING REGULATING STATIONMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. BELAH2017COMPLETED
        
11GAS PIPELINE Ø8″ SCH 40MAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG GN. BELAH2017COMPLETED
        
12MECHANICAL & ELECTRICAL SUPPLY (1 x 1,000 KVA DIESEL ENGINE INSTALLATIONS)PT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2017COMPLETED
        
13EPC – TRK 4A “2 x JGS 620” (2 x 3,3 MW) JENBACHER GAS ENGINE ENCLOSURE TYPEMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG BINALATUNG2017COMPLETED
        
14EPC – MRS NATURAL GASMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG BINALATUNG2017COMPLETED
        
15TIE IN & NEW INSTALLATION (GAS PIPE)MAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG BINALATUNG2017COMPLETED
        
16SUPPLY & INSTALL (2 X 500 M3/HOUR) SUBMERSIBLE PUMP C/W ACCESSORIES (PHASE 1)PT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2017COMPLETED
        
17SUPPLY & INSTALL (1 X 500 M3/HOUR) SUBMERSIBLE PUMP C/W ACCESSORIES (PHASE 2)PT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2017COMPLETED
        
18TURBO JET BLOWER PLATFORMPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2018COMPLETED
        
19EPC – NEW TJP “4 x JGS 620” (4 X 3,3 MW) JENBACHER GAS ENGINE ENCLOSURE TYPEMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG TJ. JABUNG2018COMPLETED
        
20EMERGENCY CARGO LIFTPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2018COMPLETED
        
21DISMANTLING 3 x JGS 320 GAS ENGINE CONTAINERIZED (MECHANICAL, ELECTRICAL & CIVIL)MAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG BONTANG2018COMPLETED
        
22FABRICATION & INSTALATION WALL CLADDING COLD STORAGE BUILDINGPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2018COMPLETED
        
23CONCEPTUAL DESIGN; FS (FEASIBILITY STUDY) & FEED (FRONT END ENGINEERING DESIGN) PAPER WASTE RECYCLINGPT. JIEPPT. JIEPEHS CONSULTANTBOGOR2018COMPLETED
        
24COLD TAPPING FOR HEADER INLET PIPE MODIFICATIONUP. PJB MUARA KARANGPT. ANUGERAH MEGA ENERGIOIL & GASPLTGU MUARA KARANG2018COMPLETED
        
25DISMANTLING 3 x 3,3 MW GE JENBACHER GAS ENGINE ENCLOSURE TYPEMAXPOWER GROUPPT. MAXPOWER INDONESIAPOWER PLANTPLTMG BONTANG2018COMPLETED
        
26FS (FEASIBILITY STUDY) & EPC – INDUSTRIAL INCINERATOR CAP. 200 Kg/HPT. SUPER UNGGAS JAYAPT. SUPER UNGGAS JAYAFARMKUNINGAN2019COMPLETED
        
27MECHANICAL & ELECTRICAL WORKS BIOGAS PLANT 1,100 M3/ HOURSPT. GDA (DJARUM GROUP)IES BIOGAS (ITALLY)OIL & GASGDA PLANT – SUBANG2019COMPLETED
        
28SUPPLY & INSTALL CONTROL SYSTEM FOR BIOGAS PLANTPT. GDA (DJARUM GROUP)IES BIOGAS (ITALLY)OIL & GASGDA PLANT – SUBANG2019COMPLETED
        
29MECHANICAL WORKS 4 X 1230 KVA DIESEL ENGINE (CUMMINS)PT. PAKUWON JATI. TbkPT. PAKUWON JATI. TbkSHOPPING MALLPLAZA BLOK M2019COMPLETED
        
30FABRICATION PLATFORM 3 x 850 HP COMPRESSOR & CONDENSOR PLANT 3PT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2020COMPLETED
        
31FS (FEASIBILITY STUDY) & FEED (FRONT END ENGINEERING DESIGN) INCINERATION & COGENERATION PLANTPT. TRIKARTEKPT. TRIKARTEKEHS CONSULTANTBEKASI2018COMPLETED
        
32OFFICE & CONTROL PLANT 3 EXPANSION PROJECTPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2020COMPLETED
        
33DESIGN STUDY/ CALCULATION FOR RETROFITTING CONDENSATE TANKUP. PJB MUARA KARANGPT. ANUGERAH MEGA ENERGIOIL & GASPLTGU MUARA KARANG2021COMPLETED
        
34REPAIR & MODIFICATION 2 x HAZARDOUS WASTE INCINERATOR CAP.600 Kg/HPT. HORAS MIDUKPT. HORAS MIDUKWASTE MANAGEMENTSUKABUMI2021COMPLETED
        
35RE – FEASIBILITY STUDY EXISTING 2 x CAP.600 Kg/H HAZARDOUS INCINERATION PLANTPT. HORAS MIDUKPT. HORAS MIDUKWASTE MANAGEMENTSUKABUMI2021COMPLETED
        
36EPC – ETHYLE MERCHAPTAN DISPOSAL EQUIPMENT SYSTEMPT. HORAS MIDUKPT. HORAS MIDUKWASTE MANAGEMENTSUKABUMI2021COMPLETED
        
37EPC – LIQUID HAZARDOUS WASTE FEEDING SYSTEMPT. HORAS MIDUKPT. HORAS MIDUKWASTE MANAGEMENTSUKABUMI2021COMPLETED
        
38EPC – STEEL STRUCTURE PLANT 3 EXPANSION PROJECTPT. EKA BOGA INTIPT. EKA BOGA INTIFOOD & BEVERAGESJAKARTA FACTORY2021ON GOING